Enfield Bridge Rehabilitation

Location: Enfield, CT
Project Completion Date: 10/13/17
Client: Connecticut Department of Transportation
Budget: $156,500
Carylon Operating Company: National Water Main Cleaning (Canton, MA)
Services Performed: Spincasting

National Water Main Cleaning Co. was selected to centrifugally cast AP/M Permaform PL 8,000 to a 11′ wide and 7′ tall CMP for 190 LF. NWMCC filled in by hand 2″ deep x 8″ wide corrugation then spin casted a 2″ thick liner on top of the filled corrugation. The large size of the pipe was a challenge as it was the maximum size for the spin casting equipment.